Hong Kong · Import & Export

Apparel, toys and sporting goods — sourced right the first time.

Send us your specs and we run your order through vetted Pearl River Delta factories, inspect it before it ships, and deliver on FOB, CIF or DDP. You get product that matches the sample and lands on time — and one Hong Kong team that answers for all of it.

Apparel & garments Toys Sporting goods
Why work with us

Stop juggling five vendors. Talk to one.

Import on your own and you end up chasing a factory, a forwarder, an inspector and a customs broker — in a time zone where it's already tomorrow. Hand it to us and you get one accountable answer instead. We do that legwork for you, in Chinese, with people on the ground across the Pearl River Delta.

We're not a marketplace and we're not a factory. We're the people who walk your production line, hold the shipment when it isn't right, and keep your costs itemized so you always know what you're paying for.

Three product lines

Three things we know cold — and one we won't bluff about

01 / Apparel Rolls of fabric and garments inside a textile workshop

Apparel & Garments

Knitwear, woven tops, uniforms and workwear from cut-and-sew factories in Guangdong and Zhejiang. We keep sizing and shade matching from one run to the next — so your reorder looks like your first order — and build private label from your tech pack or ours.

MOQ 300–500 / style Lead time 30–45 days OEM / ODM
Apparel division
02 / Toys Plush and wooden educational toys arranged on a shelf

Toys

Plush, wooden educational and plastic toys from Chenghai factories that already export. We line up EN71 and ASTM F963 testing through accredited labs and sort the age-grading artwork while production runs — so your goods clear customs instead of getting held at the border.

MOQ 500–1,000 / item Lead time 35–60 days EN71 / ASTM
Toys division
03 / Sport Dumbbells and fitness equipment in a training space

Sporting Goods

Fitness equipment, stitched and inflatable balls, outdoor gear and sublimated team kit for retailers, clubs and institutional buyers. We push QC hardest where it counts — stitch strength, finishing and safe materials — so the gear holds up to real use, not just the photo.

MOQ 100–500 / item Lead time 30–50 days Custom logos
Sporting goods division
Inspector checking a garment on a production line
Why JIAZC

Anyone can quote a price. We sweat what happens next.

The cheap quote isn't worth much if the goods arrive wrong. What protects you is the in-line check that catches a fabric-weight problem early, and the email that tells you a sailing slipped before you find out from a tracking page. That's the part we own.

  • Real factories, not anonymous listingswe visit them in person and match one to your spec, MOQ and budget.
  • Proof, not promisesin-line and pre-shipment checks to an agreed AQL, with photo reports in your inbox.
  • No surprises on the invoiceFOB, CIF or DDP quotes that break out unit price, inspection and freight.

How we work

In practice

The numbers behind the promise

Pulled straight from our order book — not rounded up for a brochure.

3 Product lines we source and inspect
3 Incoterms we ship on — FOB, CIF, DDP
96% Orders that passed QC on the first inspection
How an order runs

From your first email to goods on the water

01

Inquiry & quote

Send your specs, target price and quantity. You get sourcing options and an itemized FOB or CIF quote back — usually within two business days.

02

Sampling & sign-off

You approve a pre-production sample. We lock materials, sizing and packaging and agree the AQL — before anyone cuts bulk.

03

Production & QC

We check the line during the run and inspect again before shipment — both backed by photos you see before you release the balance.

04

Booking & export

We book space, supervise loading, prepare the customs documents and ship under FOB, CIF or DDP from Nansha, Shekou or Yantian. You just receive the goods.

Export lanes

From the Pearl River Delta straight to your port

We load mainly from Nansha and Shekou, and route through Yantian for transpacific sailings. Consolidation, loading supervision and customs paperwork are all done before your container leaves the gate — so you skip the scramble at origin.

  • Nansha / ShekouUS West Coast · 18–24 days
  • YantianRotterdam / Hamburg · 30–35 days
  • NanshaJebel Ali · 18–22 days
  • ShekouSantos · 35–42 days
  • NanshaSydney / Melbourne · 16–20 days

Tell us what you need to import

Send your product, quantity and destination. You'll get a sourcing plan, an itemized quote and a realistic timeline — usually within two business days. No obligation, no runaround.